Construction of this 10-storey building ended in 1970. Total surface of the property amounts 4000 sq m, of which 2500 sq m is dedicated for office space. Typical floor plate amounts 400 sq m. There is 1 underground floor with parking for 14 cars and ground parking for 13 cars. The building has renovated, representative entrance hall with a staircase. In the standard of the building are air conditioning, suspended ceiling and tiltable windows and the layout of the floor allows for flexible arrangement.

  • The prtopercy consists of 2 office buildings: 5 and 10-storey

  • The access to the building from two sides

  • The underground parking

  • Parking ratio: 6%.

Lokalizacja

Complex of 2 buildings adjacent to Zelazna and Panska streets; The eastern part of Wola district; The situationnearby intersection of Jana Pawla II Avenue and Swietokrzyska street; Location in Central Business District; Convienient communication links.

Dane techniczne

  • Ilość budynków w parku
    1
  • Klasa budynku
    B
  • Liczba poziomów podziemnych
    1
  • Liczba pięter naziemnych
    10
  • Powierzchnia typowego piętra
    400
  • Wysokość
  • Recepcja
    TAK
  • BMS
    NIE
  • Czujniki ciepła
    NIE
  • Czujniki dymu
    NIE
  • Klimatyzacja
    TAK
  • Okna otwierane
    NIE
  • Podnoszona podłoga
    NIE
  • Kontrolowany dostęp
    TAK
  • Usługa ochrony
    TAK
  • Monitoring
    TAK
  • Dwa niezależne źródła zasilania
    NIE
  • Certyfikaty
    NIE
  • ID oferty
    bb9278

Odległości

Dworzec Centralny
Przystanek autobusowy/tramwajowy
Centrum Handlowe
Hotel (****)
Stacja metra Rondo ONZ
Lotnisko Chopina

Dane rynkowe

In the third quarter of 2023, one new office project was put into operation in Warsaw. It was S-Bridge Office Park A2, which added to the eastern office zone of Warsaw.

At the end of the 3rd quarter, over 240,000 sq m were under construction on the Warsaw market. m2 of modern office space. The greatest developer activity is observed in the Centrum-Zachód office subzone, which is located near Rondo Daszyńskiego. Almost 70% of the newly created office space in Warsaw is built there.

In the third quarter of 2023, the vacancy rate on the Warsaw office market decreased by 0.8 percentage points. compared to the previous quarter, to 10.6%. The lowest availability of office space is in the central zone. The vacancy rate here was 9.1%, while in non-central zones it was 11.8%. The highest vacancy rate was recorded in Służewiec, the lowest in the Center-North subzone.

Vacancy Rates Warsaw Q3 2023
więcej ofert
więcej ofert
więcej ofert