Dodano do porównań. Sprawdź dodane nieruchomości.

Focus – office space for rent at the Armii Ludowej Avenue in Warsaw

Office space at the Armii Ludowej Avenue

This cube-shaped building was designed by the well-known APA Kuryłowicz&Associates Warsaw studio. The office building has 12 storeys above ground and 3 underground storeys which provide 406 parking spaces. The building has 62000 sq m of total area, of which 32000 sq m dedicated for office area. Typical floor area amounts 750 sq m. The building has very high and glazed atrium connected with winter garden. The office building has green certificate BREEAM on Very Good level.

A modern A class office building The property consists of four completely independent and self-sufficient parts The complex has facilities such as a restaurant, cafe, fitness club and a fully equipped conference centre The building provides access control to all interests, security and reception for potential guests of tenants The building is specially designed in terms of environmental protection, certified by BREEM certificate

Lokalizacja

The location of the Focus office building at one of the main thoroughfares of Warsaw – Armii Ludowej Avenue and at the same time between the roundabout of Jazdy Polskiej and Niepodległości Avenue Convenient connections with the rest of the city Near the station of the first metro line: Metro Politechnika The neighbourhood of one of the largest parks in Warsaw: Pola Mokotowskie Directly from the Focus office building, there are both tram and bus stops About 5 minutes to the Central Railway Station in Warsaw

Dane techniczne

  • Ilość budynków w parku
    1
  • Klasa budynku
    A
  • Liczba poziomów podziemnych
    3
  • Liczba pięter naziemnych
    12
  • Powierzchnia typowego piętra
    750
  • Wysokość
  • Recepcja
    TAK
  • BMS
    TAK
  • Czujniki ciepła
    TAK
  • Czujniki dymu
    TAK
  • Klimatyzacja
    TAK
  • Okna otwierane
    TAK
  • Podnoszona podłoga
    TAK
  • Kontrolowany dostęp
    TAK
  • Usługa ochrony
    TAK
  • Monitoring
    TAK
  • Dwa niezależne źródła zasilania
    TAK
  • Certyfikaty
    TAK
  • Blisko metra
    TAK
  • ID oferty
    bb9455

Odległości

metro politechnika
pole mokotowskie
Lotnisko Chopina
Dworzec Centralny
metro pole mokotowskie
przystanek autobusowy GUS

Dane rynkowe

In the third quarter of 2023, one new office project was put into operation in Warsaw. It was S-Bridge Office Park A2, which added to the eastern office zone of Warsaw.

At the end of the 3rd quarter, over 240,000 sq m were under construction on the Warsaw market. m2 of modern office space. The greatest developer activity is observed in the Centrum-Zachód office subzone, which is located near Rondo Daszyńskiego. Almost 70% of the newly created office space in Warsaw is built there.

In the third quarter of 2023, the vacancy rate on the Warsaw office market decreased by 0.8 percentage points. compared to the previous quarter, to 10.6%. The lowest availability of office space is in the central zone. The vacancy rate here was 9.1%, while in non-central zones it was 11.8%. The highest vacancy rate was recorded in Służewiec, the lowest in the Center-North subzone.

Vacancy Rates Warsaw Q3 2023
więcej ofert
więcej ofert
więcej ofert

Najczęściej wyszukiwane frazy