Dodano do porównań. Sprawdź dodane nieruchomości.

Eurocentrum Office Complex is an office complex which consists of three parts and offering on 15 floors about 70000 sq m of office space for lease. The careful selection of top-class materials and the use of modern technology, will ensure comfort, convenience and safety for tenants. For tenants use the complex also provides facilities such as: restaurant, shop, drugstore, cafe, numerous service points and conference center. Eurocentrum has gold LEED – ecologist certified.

  • The object is an A-class office development

  • Eurocentrum Office Complex is a new project of an office complex, composed of three parts

  • The underground parking provides 612 parking spaces

  • Offices equipped with air-conditioning, suspended ceilings, raised floors and the system of telephone and power cabling

  • Possibility to arrange space according to tenant’s requirements.

Lokalizacja

Eurocentrum office building is situated in Central Business District; Location on the border of two Warsaw’s districts, Śródmieście and Ochota, Aleje Jerozolimskie St.; Prestigious location in Warsaw; Convenient connections to others districts of the city by tram and bus lines.

Dane techniczne

  • Ilość budynków w parku
    2
  • Klasa budynku
    A
  • Liczba poziomów podziemnych
    3
  • Liczba pięter naziemnych
    15
  • Powierzchnia typowego piętra
  • Wysokość
  • Recepcja
    TAK
  • BMS
    TAK
  • Czujniki ciepła
    NIE
  • Czujniki dymu
    TAK
  • Klimatyzacja
    TAK
  • Okna otwierane
    NIE
  • Podnoszona podłoga
    TAK
  • Kontrolowany dostęp
    TAK
  • Usługa ochrony
    TAK
  • Monitoring
    NIE
  • Dwa niezależne źródła zasilania
    TAK
  • Certyfikaty
    TAK
  • ID oferty
    bk4984

Odległości

Dworzec Zachodni
Dworzec Centralny
Lotnisko Chopina

Dane rynkowe

In the third quarter of 2023, one new office project was put into operation in Warsaw. It was S-Bridge Office Park A2, which added to the eastern office zone of Warsaw.

At the end of the 3rd quarter, over 240,000 sq m were under construction on the Warsaw market. m2 of modern office space. The greatest developer activity is observed in the Centrum-Zachód office subzone, which is located near Rondo Daszyńskiego. Almost 70% of the newly created office space in Warsaw is built there.

In the third quarter of 2023, the vacancy rate on the Warsaw office market decreased by 0.8 percentage points. compared to the previous quarter, to 10.6%. The lowest availability of office space is in the central zone. The vacancy rate here was 9.1%, while in non-central zones it was 11.8%. The highest vacancy rate was recorded in Służewiec, the lowest in the Center-North subzone.

Vacancy Rates Warsaw Q3 2023
więcej ofert
więcej ofert
więcej ofert

Najczęściej wyszukiwane frazy