Dodano do porównań. Sprawdź dodane nieruchomości.

Gdanski Business Center

Modern office space located near Dworzec Gdański in Warsaw

Gdansk Business Center is a modern office complex, which consists of four buildings with a total leasable area of approx. 97 900 sq m. The buildings have been designed in accordance with the standards of the BREEAM environmental certification. Typical floor plate depending on the buildings is 1800 – 3750 sq m. In the neighbourhood are many amenities: Arkadia Shopping Centre which is perfect outdoor meeting place with numerous cafes and restaurants.

  • BMS

  • Smoke vents

  • Air conditioning

  • Control access

  • Security

  • Divided space

  • Sprinklers

  • Raised floors

  • Suspended ceilings.

Lokalizacja

Gdański Business Center is located in Muranow, the business district of Warsaw; Property situated in the attractive location nearby Andersa and Inflancka St; Convenient connection with the Żoliborz district; Good connection with the districts on the right bank of the Vistula through the Gdański Bridge The commercial property is located in proximity to the Warszawa Gdańska railway station The location of the office complex provides excellent access to public transport – 150 meters from the Dworzec Gdański metro station, railway station, and tram and bus stops; There is the Arkadia shopping center within a walking distance Very good access for employees using public transport who commute from Śródmieście, Wola, Żoliborz as well as the Praga; There are numerous shops, service points and restaurants in the vicinity.

Dane techniczne

  • Ilość budynków w parku
    4
  • Klasa budynku
    A
  • Liczba poziomów podziemnych
    3
  • Liczba pięter naziemnych
    9
  • Powierzchnia typowego piętra
    2 380 - 3 750
  • Wysokość
  • Recepcja
    TAK
  • BMS
    TAK
  • Czujniki ciepła
    NIE
  • Czujniki dymu
    TAK
  • Klimatyzacja
    TAK
  • Okna otwierane
    NIE
  • Podnoszona podłoga
    TAK
  • Kontrolowany dostęp
    TAK
  • Usługa ochrony
    TAK
  • Monitoring
    NIE
  • Dwa niezależne źródła zasilania
    TAK
  • Certyfikaty
    NIE
  • Blisko metra
    TAK
  • ID oferty
    bk9882

Odległości

Metro Dworzec Gdański
Dworzec Warszawa Gdańska
CH Arkadia
Dworzec Centralny
Lotnisko Chopina

Dane rynkowe

In the third quarter of 2023, one new office project was put into operation in Warsaw. It was S-Bridge Office Park A2, which added to the eastern office zone of Warsaw.

At the end of the 3rd quarter, over 240,000 sq m were under construction on the Warsaw market. m2 of modern office space. The greatest developer activity is observed in the Centrum-Zachód office subzone, which is located near Rondo Daszyńskiego. Almost 70% of the newly created office space in Warsaw is built there.

In the third quarter of 2023, the vacancy rate on the Warsaw office market decreased by 0.8 percentage points. compared to the previous quarter, to 10.6%. The lowest availability of office space is in the central zone. The vacancy rate here was 9.1%, while in non-central zones it was 11.8%. The highest vacancy rate was recorded in Służewiec, the lowest in the Center-North subzone.

Vacancy Rates Warsaw Q3 2023
więcej ofert
więcej ofert
więcej ofert

Najczęściej wyszukiwane frazy