Dodano do porównań. Sprawdź dodane nieruchomości.

Płowiecka 105/107 Warsaw Wawer offices for lease

Ready to move in offices - Warsaw Wawer

05/107 Płowiecka Street is a 3-story office building in Warsaw, Wawer, offering approximately 1,600 sqm of leasable space. This intimate office building located on the right bank of Warsaw, surrounded by low-rise buildings, is an excellent office space for companies that need an office outside the city center. A large parking lot for employees and guests is a further advantage.

  • 3-story office building with a total lease area of approximately 1,634 sqm

  • The high standard of finishes of the office space provides comfortable, safe, and friendly working conditions

  • The building provides access to about 60 above-ground parking spaces

  • The office building is equipped with all technical solutions and amenities provided for this class of buildings. The area of a typical floor is about 500 sqm.

Lokalizacja

The office building is located in Warsaw’s Wawer district, at 105/107 Płowiecka Street; Office building on the right bank of the Vistula River; Good access for employees and customers thanks to its location on the main road artery connecting the left and right sides of Warsaw via the Siekierkowski Bridge; Excellent accessibility from Warsaw Wesoła, Rembertów, and Praga Południe’s surrounding areas; The property is about a 20-minute drive from the city’s main train station (PKP Warszawa Centralna); Frederic Chopin International Airport is a 25-minute drive from the property.

Dane techniczne

  • Ilość budynków w parku
    1
  • Klasa budynku
    B
  • Liczba poziomów podziemnych
  • Liczba pięter naziemnych
  • Powierzchnia typowego piętra
  • Wysokość
  • Recepcja
    TAK
  • BMS
    NIE
  • Czujniki ciepła
    NIE
  • Czujniki dymu
    NIE
  • Klimatyzacja
    TAK
  • Okna otwierane
    TAK
  • Podnoszona podłoga
    NIE
  • Kontrolowany dostęp
    NIE
  • Usługa ochrony
    TAK
  • Monitoring
    TAK
  • Dwa niezależne źródła zasilania
    NIE
  • Certyfikaty
    NIE
  • ID oferty
    bb10908

Odległości

Lotnisko Chopina
Dworzec Centralny

Dane rynkowe

In the third quarter of 2023, one new office project was put into operation in Warsaw. It was S-Bridge Office Park A2, which added to the eastern office zone of Warsaw.

At the end of the 3rd quarter, over 240,000 sq m were under construction on the Warsaw market. m2 of modern office space. The greatest developer activity is observed in the Centrum-Zachód office subzone, which is located near Rondo Daszyńskiego. Almost 70% of the newly created office space in Warsaw is built there.

In the third quarter of 2023, the vacancy rate on the Warsaw office market decreased by 0.8 percentage points. compared to the previous quarter, to 10.6%. The lowest availability of office space is in the central zone. The vacancy rate here was 9.1%, while in non-central zones it was 11.8%. The highest vacancy rate was recorded in Służewiec, the lowest in the Center-North subzone.

Vacancy Rates Warsaw Q3 2023
więcej ofert
więcej ofert
więcej ofert

Najczęściej wyszukiwane frazy